Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Gravesend

Loading houses in Gravesend

We take enquiries about loading houses from businesses in Gravesend and across Kent, and manage each job from the first conversation to completion, with specialist engineers working under our management.

Guide £14,500–£32,000 per house ex VATFree site surveyDA12
Location
Gravesend, Kent
Main postcode district
DA12
Nearby (straight line)
Tilbury (2 miles), Grays (3 miles) and Strood (6 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Where does this fit at a dock in Gravesend?

For older buildings in Gravesend with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations. Any loading house proposed in Gravesend needs its planning and building control position checked, which we look at during the site survey before quoting.

Racked warehouses around Gravesend that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

If you are planning loading houses for a site in Gravesend, expect four stages. A free survey and fixed written quote come first. We then agree a programme with you, including any out-of-hours work. Specialist installation engineers carry out the installation under our management, with us as your single point of contact. Finally, the equipment is tested, your staff are shown how it works and everything is handed over with its documentation.

What is a loading house made of?

A loading house is a steel frame clad in insulated composite panels, with a dock leveller built into its floor and a shelter or seal across its front. It is made to suit your building, trailers and yard rather than bought off the shelf.

  • Frame: galvanised or painted steel, supported on legs or a sub-frame that sits on concrete foundations.
  • Walls and roof: insulated composite panels, usually colour-matched to the building cladding, with guttering to carry rainwater away.
  • Floor and leveller: a steel deck with a hydraulic swing-lip or telescopic-lip leveller set into it.
  • Front: a retractable or inflatable shelter or a foam seal, with bumpers below to take trailer impact.
  • Building door: an insulated sectional door in the original wall opening, closing the building when no trailer is docked.
  • Extras: internal lighting, dock lights and traffic lights as required.

The insulated envelope reduces the heat or chill lost around the trailer compared with an open dock.

How much does a loading house cost?

A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.

What moves the price:

  • Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
  • Leveller type: telescopic-lip levellers cost more than swing-lip.
  • Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
  • Foundations: ground conditions and buried services decide the size of pads or footings.
  • Building works: forming or enlarging the wall opening, and a new insulated door if needed.
  • Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.

These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.

Guide price, Gravesend
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Control positions, isolators and any existing interlocks
  • Working hours, shift patterns and windows for out-of-hours work
  • Gaps around trailers where heated or chilled air escapes
  • Forklift and pallet truck loads crossing the leveller platform
  • Yard gradient and the slope of the approach to the dock
  • Dock height and the mix of trailers you load

Options to discuss

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Planning, building control and safety law in England

Lift tables and dock lifts in Gravesend may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about loading houses in Gravesend

Will you deal with building control and planning for a project in Gravesend?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

How long does installation take at a site in Gravesend?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

What details do you need from us to quote for loading houses?

To get started, send the site address in Gravesend, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.

How long does a loading house take to install?

The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Loading houses near Gravesend

Sites close to Gravesend get the same service, including those in Tilbury (2 miles), Grays (3 miles) and Strood (6 miles), with every job run the same way.

Other loading bay services in Gravesend

Full guide to loading houses · Everything we do in Gravesend

Tell us what is happening at your Gravesend dock, what equipment is there and when it is used, and we will suggest the right next step.

Call freeGet a quote