- Location
- Broxburn, Edinburgh and the Lothians
- Main postcode district
- EH52
- Nearby (straight line)
- Livingston (3 miles), Bathgate (7 miles) and Dunfermline (10 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
What should sites in Broxburn consider?
Any loading house proposed in Broxburn needs its planning and building control position checked, which we look at during the site survey before quoting. Racked warehouses around Broxburn that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
For older buildings in Broxburn with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.
We do not give a fixed price without seeing the site. A free survey in Broxburn lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.
Does a loading house need planning permission or building approval?
A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.
Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.
Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.
The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.
Can a loading house be added to an existing building?
Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.
At survey we check:
- the floor height inside against the yard level outside;
- whether an existing door opening can be used, or a new one formed in the cladding or masonry;
- drains, ducts and other buried services where foundations will go;
- the space trailers need to manoeuvre, and whether an angled house would work better;
- any planning or building control approval the project may need.
Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Wall and steel structure for door, shelter and bumper fixings
- Condition of any existing leveller pit, kerb angles and pit drainage
- Yard gradient and the slope of the approach to the dock
- Power supply at each bay, including three-phase availability
- Traffic routes for vehicles and separation of pedestrians
- Whether planning, building control or a building warrant may be needed
Options to discuss
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
What do the rules in Scotland mean for the work?
HSE is the workplace safety regulator in Scotland. At a loading bay in Broxburn, doors need to satisfy regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, dock equipment must be kept safe under PUWER, and drivers must be prevented from pulling away too early. We check what applies at survey.
Questions about loading houses in Broxburn
Which building and safety rules apply to a site in Broxburn?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Broxburn, we check what applies at survey and design to it.
Will you deal with building control and planning for a project in Broxburn?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
What details do you need from us to quote for loading houses?
To get started, send the site address in Broxburn, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Can a loading house be used for a cold store?
Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.
Can a loading house be moved later?
Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.
Loading houses near Broxburn
Other towns within reach of Broxburn on our coverage list include Livingston (3 miles), Bathgate (7 miles) and Dunfermline (10 miles), all covered on the same terms.
Other loading bay services in Broxburn
Full guide to loading houses · Everything we do in Broxburn
If a loading bay in Broxburn needs attention, call us or send photos and details online.
