- Location
- Aberystwyth, Dyfed
- Main postcode district
- SY24
- Nearby (straight line)
- Remote location, covered by arrangement
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Where does this fit at a dock in Aberystwyth?
Any loading house proposed in Aberystwyth needs its planning and building control position checked, which we look at during the site survey before quoting. Manufacturing businesses around Aberystwyth adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside.
Racked warehouses around Aberystwyth that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
Keeping the dock running is usually the first concern, so we plan around it. After a free survey of your Aberystwyth site and a written quote at a fixed price, we agree when each bay can be released and whether any work should happen out of hours. Specialist installation engineers working under our management then fit the equipment, and we test it and hand over the documentation before the bay goes back into use.
Can a loading house be added to an existing building?
Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.
At survey we check:
- the floor height inside against the yard level outside;
- whether an existing door opening can be used, or a new one formed in the cladding or masonry;
- drains, ducts and other buried services where foundations will go;
- the space trailers need to manoeuvre, and whether an angled house would work better;
- any planning or building control approval the project may need.
Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.
Does a loading house need planning permission or building approval?
A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.
Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.
Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.
The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.
The same published guide range applies across Wales; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Scope to convert ground-level doors into docks or add lift tables
- Control positions, isolators and any existing interlocks
- Headroom above the opening and which track type will suit it
- Escape routes and pedestrian doors close to the bay
- Lighting inside trailers and at the dock face
- Wall and steel structure for door, shelter and bumper fixings
Options to discuss
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Planning, building control and safety law in Wales
HSE regulates workplace safety in Wales. Loading bays in Aberystwyth need doors that meet regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, work equipment maintained under PUWER, and safeguards that stop vehicles leaving the dock too early. We check what applies at survey and build those measures into the design.
Questions about loading houses in Aberystwyth
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Aberystwyth, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Is VAT included in your guide prices for loading houses?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Dyfed as everywhere else: for loading houses, it is £14,500 to £32,000 per house, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Which building and safety rules apply to a site in Aberystwyth?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Aberystwyth, we check what applies at survey and design to it.
Can a loading house be moved later?
Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.
What door is used with a loading house?
The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.
Loading houses near Aberystwyth
Other loading bay services in Aberystwyth
Full guide to loading houses · Everything we do in Aberystwyth
For a written price on loading bay work in Aberystwyth, request a quote and include photos of the bay if you can.
