- Location
- Bodmin, Cornwall
- Main postcode district
- PL31
- Nearby (straight line)
- St Austell (9 miles), Newquay (16 miles) and Truro (20 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Is this right for your site in Bodmin?
Manufacturing businesses around Bodmin adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside. Where a yard in Bodmin is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.
Chilled stores near Bodmin sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked.
Any project involving loading houses at a working site in Bodmin takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.
What happens on site when a loading house is installed?
Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.
- Foundations: concrete pads or footings are formed in the yard and left to cure.
- Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
- Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
- Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
- Commissioning: everything is tested with a trailer before handover.
We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.
Can a loading house be added to an existing building?
Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.
At survey we check:
- the floor height inside against the yard level outside;
- whether an existing door opening can be used, or a new one formed in the cladding or masonry;
- drains, ducts and other buried services where foundations will go;
- the space trailers need to manoeuvre, and whether an angled house would work better;
- any planning or building control approval the project may need.
Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Headroom above the opening and which track type will suit it
- Clear opening width and height for each door
- Wheel guide positions and yard markings for reversing vehicles
- Working hours, shift patterns and windows for out-of-hours work
- Control positions, isolators and any existing interlocks
- Escape routes and pedestrian doors close to the bay
Options to discuss
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
What do the rules in England mean for the work?
In England, Approved Document L (2021) sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. That shapes door specification for sites in Bodmin, so we confirm the requirement for your project and check what applies at survey before recommending a door.
Questions about loading houses in Bodmin
Which building and safety rules apply to a site in Bodmin?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Bodmin, we check what applies at survey and design to it.
How do you price loading houses for a site in Bodmin?
Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Bodmin site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
What door is used with a loading house?
The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.
Can a loading house be used for a cold store?
Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.
Loading houses near Bodmin
Other towns within reach of Bodmin on our coverage list include St Austell (9 miles), Newquay (16 miles) and Truro (20 miles), all covered on the same terms.
Other loading bay services in Bodmin
Full guide to loading houses · Everything we do in Bodmin
Speak to us about your Bodmin loading bay. We will ask the right questions, then set out the next step clearly.
