Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Ely

Loading houses in Ely

We look after loading houses for warehouses and factories in Ely, planning the work around deliveries and collections so that the dock stays as available as possible.

Guide £14,500–£32,000 per house ex VATFree site surveyCB7
Location
Ely, Cambridgeshire
Main postcode district
CB7
Nearby (straight line)
Newmarket (12 miles), March (13 miles) and St Ives (15 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

What matters for loading houses in Ely?

Any loading house proposed in Ely needs its planning and building control position checked, which we look at during the site survey before quoting. Racked warehouses around Ely that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

Manufacturing businesses around Ely adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside.

Here is what happens after you contact us about a site in Ely. We arrange a free survey, measure up and send a fixed written quote. If you go ahead, we manage the whole job, including ordering, delivery and coordination with your site team. Specialist installation engineers working under our management do the fitting, at times built around your loading schedule, with out-of-hours work by arrangement. Testing and handover documents close the job.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

When is a loading house better than an internal dock?

A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.

  • No room inside: racking, production lines or mezzanines sit right up to the wall.
  • Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
  • Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
  • Security: the building can be closed at the wall line while the house itself stays open to the yard.
  • Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.

Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.

Guide price, Ely
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Escape routes and pedestrian doors close to the bay
  • Drainage on recessed or sloping dock approaches
  • Condition of any existing leveller pit, kerb angles and pit drainage
  • Scope to convert ground-level doors into docks or add lift tables
  • Asbestos register and any other site hazard information
  • Wheel guide positions and yard markings for reversing vehicles

Options to discuss

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Planning, building control and safety law in England

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Ely. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about loading houses in Ely

Is VAT included in your guide prices for loading houses?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Cambridgeshire as everywhere else: for loading houses, it is £14,500 to £32,000 per house, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

How do you price loading houses for a site in Ely?

Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

What details do you need from us to quote for loading houses?

To get started, send the site address in Ely, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.

Is a loading house cheaper than forming an internal pit?

Not always. A loading house includes a whole steel structure, so the equipment cost is higher, but it avoids breaking out the slab and losing internal floor space. The best comparison is made at survey, taking account of racking, services under the floor and how the building will be used.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

Loading houses near Ely

The same survey, quote and repair service is available in towns around Ely, such as Newmarket (12 miles), March (13 miles) and St Ives (15 miles).

Other loading bay services in Ely

Full guide to loading houses · Everything we do in Ely

Phone us to discuss your loading bay in Ely, or start with the online quote tool if you prefer to send details first.

Call freeGet a quote