Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Kempston

Loading houses in Kempston

Warehouse, factory and trade sites in Kempston can bring requests for loading houses to us, and we organise the work in a way that suits how the site operates.

Guide £14,500–£32,000 per house ex VATFree site surveyMK42
Location
Kempston, Bedfordshire
Main postcode district
MK42
Nearby (straight line)
Bedford (2 miles), Ampthill (6 miles) and Newport Pagnell (10 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Why do sites in Kempston choose this?

Racked warehouses around Kempston that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead. Any loading house proposed in Kempston needs its planning and building control position checked, which we look at during the site survey before quoting.

Chilled stores near Kempston sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked.

If you are planning loading houses for a site in Kempston, expect four stages. A free survey and fixed written quote come first. We then agree a programme with you, including any out-of-hours work. Specialist installation engineers carry out the installation under our management, with us as your single point of contact. Finally, the equipment is tested, your staff are shown how it works and everything is handed over with its documentation.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

When is a loading house better than an internal dock?

A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.

  • No room inside: racking, production lines or mezzanines sit right up to the wall.
  • Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
  • Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
  • Security: the building can be closed at the wall line while the house itself stays open to the yard.
  • Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.

Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.

Guide price, Kempston
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Traffic routes for vehicles and separation of pedestrians
  • Gaps around trailers where heated or chilled air escapes
  • Asbestos register and any other site hazard information
  • Escape routes and pedestrian doors close to the bay
  • Wall and steel structure for door, shelter and bumper fixings
  • Temperature requirements for chilled, frozen or ambient goods

Options to discuss

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Angled loading house

Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.

Regulations and approvals in England

Sites in Kempston fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about loading houses in Kempston

Which building and safety rules apply to a site in Kempston?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Kempston, we check what applies at survey and design to it.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Kempston, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Will you deal with building control and planning for a project in Kempston?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Loading houses near Kempston

If your site is not in Kempston itself, it may be near one of these: Bedford (2 miles), Ampthill (6 miles) and Newport Pagnell (10 miles). Pick the closest.

Other loading bay services in Kempston

Full guide to loading houses · Everything we do in Kempston

Request a quote for your loading bay in Kempston, attaching photos of the dock, the equipment and any damage.

Call freeGet a quote