Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Inverurie

Loading houses in Inverurie

If your site in Inverurie needs loading houses, we can help, whether the dock serves a cold store, a parcel operation, a food factory or a trade counter.

Guide £14,500–£32,000 per house ex VATFree site surveyAB51
Location
Inverurie, Aberdeen and Aberdeenshire
Main postcode district
AB51
Nearby (straight line)
Westhill (10 miles), Aberdeen (14 miles) and Stonehaven (23 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Is this right for your site in Inverurie?

Chilled stores near Inverurie sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. For older buildings in Inverurie with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.

Units in Inverurie with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house.

A single contact at Loading Bay Doors handles your project in Inverurie from start to finish. The free site survey and fixed written quote come first, with no obligation to proceed. We then book the installation for times that suit the operation, including out of hours by arrangement, and manage the specialist engineers on site. At the end we commission and test the equipment, walk your team through it and provide the documentation.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

When is a loading house better than an internal dock?

A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.

  • No room inside: racking, production lines or mezzanines sit right up to the wall.
  • Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
  • Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
  • Security: the building can be closed at the wall line while the house itself stays open to the yard.
  • Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.

Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.

Guide price, Inverurie
£14,500–£32,000 per house, ex VAT

The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Yard gradient and the slope of the approach to the dock
  • Whether planning, building control or a building warrant may be needed
  • Dock height and the mix of trailers you load
  • Temperature requirements for chilled, frozen or ambient goods
  • Headroom above the opening and which track type will suit it
  • How often each door cycles during a typical shift

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Which rules apply in Scotland?

In Scotland, building work such as forming a new opening or a dock leveller pit may need a building warrant from the local authority before it starts. For sites in Inverurie, external structures such as loading houses or canopies may also need planning permission from the council. We check what applies at survey and factor any approvals into the programme.

Questions about loading houses in Inverurie

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Inverurie, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

How long does installation take at a site in Inverurie?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Can you work outside our normal operating hours in Inverurie?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

Loading houses near Inverurie

The same survey, quote and repair service is available in towns around Inverurie, such as Westhill (10 miles), Aberdeen (14 miles) and Stonehaven (23 miles).

Other loading bay services in Inverurie

Full guide to loading houses · Everything we do in Inverurie

For a written price on loading bay work in Inverurie, request a quote and include photos of the bay if you can.

Call freeGet a quote