Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Shelters and seals · Moreton

Inflatable dock shelters in Moreton

Looking for inflatable dock shelters in Moreton? We cover sites throughout Merseyside, from single loading bays to multi-door distribution buildings, and keep you informed at every stage of the work.

Guide £6,800–£12,800 per shelter ex VATFree site surveyCH46
Location
Moreton, Merseyside
Main postcode district
CH46
Nearby (straight line)
Wallasey (3 miles), Birkenhead (4 miles) and Heswall (5 miles)
Survey and quote
Free, with a fixed written quote
Inflatable dock shelters, in short

An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.

Why do sites in Moreton choose this?

Specifying a new temperature-controlled warehouse in Moreton is the ideal time to design inflatable shelters in with the doors and levellers, so controls are integrated from the start. Fresh produce cooled at a packhouse in Moreton stays colder during loading when the gap around the trailer is sealed by inflated cushions.

Operators replacing foam seals in Moreton that keep wearing out against ill-fitting trailers may find an inflatable shelter suffers far less rubbing.

Before anything is ordered, we visit your site in Moreton for a free survey and then send a written quote with a fixed price. From that point we manage the installation, coordinating delivery, access and any other trades. Fitting is done by specialist installation engineers engaged and managed by us, at times that suit your operation, including out of hours where agreed. You get a tested installation, a demonstration for your team and the manufacturer documentation.

What maintenance does an inflatable dock shelter need?

An inflatable shelter needs regular checks on its fabric, fan and controls, because a puncture or a weak fan stops it sealing properly. Planned servicing catches most faults before they affect the cold chain.

  • Cushion fabric: inspect for punctures, abrasion and failed seams, and patch or replace cushions as needed.
  • Fan unit: check filters, motor and airflow so the cushions inflate fully and promptly.
  • Retraction system: straps, weights or springs must pull the cushions back clear of the trailer.
  • Controls and interlocks: confirm the sequence with the door, leveller and restraint still works.
  • Frame and fixings: look for impact damage and corrosion.

Snow and ice on the top cushion can stop it retracting, so a check before winter is worthwhile. Service and repair visits are chargeable, and the price is agreed before anyone attends.

What is involved in installing an inflatable dock shelter?

Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.

  1. The wall is checked and fixing points or a subframe prepared.
  2. The frame is fixed from powered access equipment in the yard.
  3. Top and side cushions are fitted, with protective covers where specified.
  4. The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
  5. Inflation, deflation and cushion retraction are tested with a trailer in the bay.

You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.

Guide price, Moreton
£6,800–£12,800 per shelter, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Temperature requirements for chilled, frozen or ambient goods
  • Asbestos register and any other site hazard information
  • Drainage on recessed or sloping dock approaches
  • Dock height and the mix of trailers you load
  • Wall and steel structure for door, shelter and bumper fixings
  • Yard gradient and the slope of the approach to the dock

Options to discuss

Interlocked controls

Controls linked to the door, leveller and restraint so the shelter inflates before the door opens and deflates only once it has closed.

Top cushion only

A single inflatable cushion across the top of the opening, paired with fixed side pads or curtains, for docks where trailer heights vary more than widths.

Planning, building control and safety law in England

Workplace safety in England is regulated by HSE. For a loading bay in Moreton, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.

Questions about inflatable dock shelters in Moreton

Will you deal with building control and planning for a project in Moreton?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Is the site survey in Moreton free?

Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.

Can you work outside our normal operating hours in Moreton?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Can a punctured cushion be repaired?

Small punctures and tears can usually be patched, and a badly damaged cushion can be replaced on its own without changing the frame or fan. Repairs are carried out on a chargeable visit, with the price agreed before anyone attends.

What happens to an inflatable shelter if the power fails?

If the power fails, the fan stops and the cushions gradually deflate, so the trailer can leave once loading has been brought to a safe end. At a cold store, the dock door should be closed by hand where possible to protect the store. We explain the power failure routine at handover.

Inflatable dock shelters near Moreton

Businesses outside Moreton may find their nearest town in this list: Wallasey (3 miles), Birkenhead (4 miles) and Heswall (5 miles). Each page covers doors, docks, repairs and servicing.

Other loading bay services in Moreton

Full guide to inflatable dock shelters · Everything we do in Moreton

Call us or request a quote online to talk through loading bay work at your site in Moreton.

Call freeGet a quote