- Location
- Altrincham, Greater Manchester
- Main postcode district
- WA14
- Nearby (straight line)
- Sale (3 miles), Urmston (4 miles) and Stretford (5 miles)
- Survey and quote
- Free, with a fixed written quote
An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.
Is this right for your site in Altrincham?
Frozen food stores in Altrincham loading trailers of varying sizes can use inflatable shelters to keep warm outside air away from the open door. Operators replacing foam seals in Altrincham that keep wearing out against ill-fitting trailers may find an inflatable shelter suffers far less rubbing.
When a chilled dock in Altrincham sees condensation and ice around the door, the seal at the trailer is often where improvement starts.
Here is what happens after you contact us about a site in Altrincham. We arrange a free survey, measure up and send a fixed written quote. If you go ahead, we manage the whole job, including ordering, delivery and coordination with your site team. Specialist installation engineers working under our management do the fitting, at times built around your loading schedule, with out-of-hours work by arrangement. Testing and handover documents close the job.
How much does an inflatable dock shelter cost?
An inflatable dock shelter typically costs £6,800 to £12,800 per shelter, excluding VAT, supply and fit. It costs more than a curtain shelter or foam seal because of its cushions, fan and controls, and the closer seal it gives.
Costs are driven mainly by:
- Size: door width and height, and the range of trailers to be sealed.
- Cushion layout: a top cushion only, or top and side cushions.
- Fan and controls: standalone push-button control or full integration with the door, leveller and restraint.
- Frame and covers: the steel frame and any protective outer curtains.
- Cold store features: insulated frames or heating where ice is a concern.
- Site work: wall fixings, power supply, powered access equipment and removal of an old shelter or seal.
We fix the price in the written quote after a free site survey, which also confirms whether your trailer range suits an inflatable shelter.
How does an inflatable shelter work with the dock door and leveller?
An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.
- The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
- The trailer is secured by restraint or key control, and the outside light shows red.
- The cushions inflate around the top and sides of the trailer.
- With the trailer sealed, the door opens and the leveller is deployed.
- After loading, the leveller is stored and the door closed.
- The cushions deflate and retract, and the light turns green.
Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Condition of any existing leveller pit, kerb angles and pit drainage
- Control positions, isolators and any existing interlocks
- Access for deliveries, cranes or lifting equipment during installation
- Escape routes and pedestrian doors close to the bay
- Bumper position and wear or damage on the dock face
- How drivers are prevented from pulling away too early
Options to discuss
Top cushion only
A single inflatable cushion across the top of the opening, paired with fixed side pads or curtains, for docks where trailer heights vary more than widths.
Interlocked controls
Controls linked to the door, leveller and restraint so the shelter inflates before the door opens and deflates only once it has closed.
Which rules apply in England?
Sites in Altrincham fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about inflatable dock shelters in Altrincham
How long does installation take at a site in Altrincham?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Which building and safety rules apply to a site in Altrincham?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Altrincham, we check what applies at survey and design to it.
How do you price inflatable dock shelters for a site in Altrincham?
Guide budgets for supply and fit are £6,800 to £12,800 per shelter, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
What happens to an inflatable shelter if the power fails?
If the power fails, the fan stops and the cushions gradually deflate, so the trailer can leave once loading has been brought to a safe end. At a cold store, the dock door should be closed by hand where possible to protect the store. We explain the power failure routine at handover.
Can a punctured cushion be repaired?
Small punctures and tears can usually be patched, and a badly damaged cushion can be replaced on its own without changing the frame or fan. Repairs are carried out on a chargeable visit, with the price agreed before anyone attends.
Inflatable dock shelters near Altrincham
We also cover towns near Altrincham, including Sale (3 miles), Urmston (4 miles) and Stretford (5 miles). Each has its own page with the same services and process.
Other loading bay services in Altrincham
Full guide to inflatable dock shelters · Everything we do in Altrincham
Speak to us about your Altrincham loading bay. We will ask the right questions, then set out the next step clearly.
