Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Shelters and seals · Ely

Inflatable dock shelters in Ely

We look after inflatable dock shelters for warehouses and factories in Ely, planning the work around deliveries and collections so that the dock stays as available as possible.

Guide £6,800–£12,800 per shelter ex VATFree site surveyCB7
Location
Ely, Cambridgeshire
Main postcode district
CB7
Nearby (straight line)
Newmarket (12 miles), March (13 miles) and St Ives (15 miles)
Survey and quote
Free, with a fixed written quote
Inflatable dock shelters, in short

An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.

What matters for inflatable dock shelters in Ely?

Fresh produce cooled at a packhouse in Ely stays colder during loading when the gap around the trailer is sealed by inflated cushions. Mixed fleets arriving at a cold store in Ely, from rigids to double-deck trailers, are exactly the situation inflatable cushions are designed for.

Frozen food stores in Ely loading trailers of varying sizes can use inflatable shelters to keep warm outside air away from the open door.

How does an installation in Ely work? First, a free, no-obligation survey to measure up and understand the operation. Next, a fixed written quote. Then a programme agreed with you, so the work fits around deliveries, with out-of-hours slots if needed. The installation itself is carried out by specialist engineers who answer to us, and it finishes with testing, a walk-through for your staff and a handover pack.

How does an inflatable shelter work with the dock door and leveller?

An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.

  1. The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
  2. The trailer is secured by restraint or key control, and the outside light shows red.
  3. The cushions inflate around the top and sides of the trailer.
  4. With the trailer sealed, the door opens and the leveller is deployed.
  5. After loading, the leveller is stored and the door closed.
  6. The cushions deflate and retract, and the light turns green.

Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.

Inflatable shelter, curtain shelter or dock seal: which suits a cold chain dock?

For a cold chain dock that receives trailers of different sizes, an inflatable shelter usually gives the best balance of close sealing and flexibility. A dock seal can match it on a uniform fleet, while a curtain shelter is better suited to ambient bays.

  • Inflatable shelter: cushions adapt to each trailer's width and height and seal close to the body, with the full opening left clear.
  • Dock seal: a tight, lower-cost seal when every trailer is the same size, but it can leave gaps on other vehicles and the pads can intrude into the opening.
  • Curtain shelter: flexible and robust, but leaves small gaps that matter more at chilled and frozen docks.

Inflatables also stand clear of the trailer until it has docked, avoiding the rubbing that wears foam pads and curtains. The trade-off is the fan and controls, which need power and servicing. For frozen docks we specify the shelter alongside cold store dock doors so the two work together.

Guide price, Ely
£6,800–£12,800 per shelter, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Traffic routes for vehicles and separation of pedestrians
  • Wall and steel structure for door, shelter and bumper fixings
  • Working hours, shift patterns and windows for out-of-hours work
  • Age and condition of the equipment already in place
  • Bumper position and wear or damage on the dock face
  • Asbestos register and any other site hazard information

Options to discuss

Top cushion only

A single inflatable cushion across the top of the opening, paired with fixed side pads or curtains, for docks where trailer heights vary more than widths.

Interlocked controls

Controls linked to the door, leveller and restraint so the shelter inflates before the door opens and deflates only once it has closed.

What do the rules in England mean for the work?

Sites in Ely fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about inflatable dock shelters in Ely

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Ely, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

How long does installation take at a site in Ely?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Which building and safety rules apply to a site in Ely?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Ely, we check what applies at survey and design to it.

Does an inflatable shelter work with containers and double-deck trailers?

Yes, provided the shelter is sized for the tallest and widest vehicles you receive. The cushions adapt to each vehicle's dimensions, which is a key reason inflatable shelters suit sites handling containers, standard trailers and double-deck units at the same bays.

Is an inflatable shelter worth it at an ambient dock?

An inflatable shelter works at any dock, but at ambient bays a curtain shelter or dock seal usually gives enough sealing for less cost. Inflatables make most sense where temperature, hygiene or energy use makes the closest practical seal worth paying for.

Inflatable dock shelters near Ely

Close neighbours of Ely with their own pages here: Newmarket (12 miles), March (13 miles) and St Ives (15 miles). Choose one to see coverage details for that town.

Other loading bay services in Ely

Full guide to inflatable dock shelters · Everything we do in Ely

Use the quote tool to tell us about the doors, levellers or shelters at your Ely site, and we will be in touch to arrange the next step.

Call freeGet a quote