An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
How does this suit sites in Bicester?
If trailer heights at a site in Bicester vary widely, our survey will tell you plainly whether an edge-of-dock leveller can cope or a pit leveller is needed. Companies running their own vehicles in Bicester, where every trailer has a known bed height, are well placed to use edge-of-dock levellers instead of pit units.
Wholesalers and trade suppliers in Bicester adding a second loading position can often do so economically with an edge-of-dock unit.
For edge-of-dock levellers in Bicester, we begin with a free site survey and a fixed written quote, so you know the scope and cost before committing. We take responsibility for managing the job, and specialist installation engineers carry it out under our supervision. Bays are taken out of use in a planned sequence so the rest of the dock keeps working, and evening or weekend work can be arranged. Each item is tested at handover and the documentation is left with you.
Do edge-of-dock levellers need the same inspections as pit levellers?
Yes, an edge-of-dock leveller is work equipment just like a pit leveller, so it must be kept in a safe condition and inspected where deterioration could lead to danger. Its small size does not exempt it.
- Great Britain: PUWER 1998 applies, with HSE as the regulator.
- Northern Ireland: PUWER (Northern Ireland) 1999 applies, with HSENI as the regulator.
- Insurer inspections: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals, so ask your insurer to confirm edge-of-dock units are on the schedule.
- Standard: the dock leveller safety standard is BS EN 1398:2009, which is current and under review.
- Trapping points: HSE guidance notes that guards or skirting may be needed on dock levellers where something could be caught, so hinge areas and plate edges are checked.
Mechanical units rely on springs and hinges that wear, so an inspection should cover these as carefully as the hydraulics on a powered unit.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Age and condition of the equipment already in place
- Power supply at each bay, including three-phase availability
- Gaps around trailers where heated or chilled air escapes
- Drainage on recessed or sloping dock approaches
- Asbestos register and any other site hazard information
- Whether planning, building control or a building warrant may be needed
Options to discuss
Wider or heavy-duty plate
A wider plate or higher rating for larger forklifts, heavy loads or pallet trucks with a wide wheel track, specified after we look at your equipment.
Hydraulic edge-of-dock leveller
Push-button operation with a compact power pack, easier for frequent use and able to be interlocked with dock doors and traffic lights.
Regulations and approvals in England
Sites in Bicester fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about edge-of-dock levellers in Bicester
Can you work outside our normal operating hours in Bicester?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Will you deal with building control and planning for a project in Bicester?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Is VAT included in your guide prices for edge-of-dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Oxfordshire as everywhere else: for edge-of-dock levellers, it is £1,800 to £4,400 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Do edge-of-dock levellers need servicing?
Yes, they should be serviced and inspected like any leveller. Mechanical units need their springs, hinges and lip checked and lubricated, and hydraulic units also need hoses and the power pack inspected. Service visits are chargeable and agreed before anyone attends.
Can edge-of-dock levellers be used with vans?
Usually not. Edge-of-dock levellers are designed for trailers whose beds sit close to dock height, and many vans sit well below a typical dock, beyond the leveller's range. A lift table or a ground-level door is normally the better way to handle vans.
Edge-of-dock levellers near Bicester
The same survey, quote and repair service is available in towns around Bicester, such as Oxford (11 miles), Cowley (12 miles) and Banbury (14 miles).
Other loading bay services in Bicester
Full guide to edge-of-dock levellers · Everything we do in Bicester
Phone us to discuss your loading bay in Bicester, or start with the online quote tool if you prefer to send details first.