- Location
- Yarm, North Yorkshire
- Main postcode district
- TS15
- Nearby (straight line)
- Thornaby-on-Tees (3 miles), Stockton-on-Tees (5 miles) and Billingham (6 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Why do sites in Yarm choose this?
Wholesalers and trade suppliers in Yarm adding a second loading position can often do so economically with an edge-of-dock unit. Companies running their own vehicles in Yarm, where every trailer has a known bed height, are well placed to use edge-of-dock levellers instead of pit units.
If trailer heights at a site in Yarm vary widely, our survey will tell you plainly whether an edge-of-dock leveller can cope or a pit leveller is needed.
It starts with a free site survey in Yarm, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.
How much height difference can an edge-of-dock leveller handle?
An edge-of-dock leveller can only handle a small height difference, typically in the region of 75 to 150 mm above and below dock level depending on the model. That is enough where trailers are consistent, but not where bed heights vary widely.
Typical UK docks are around 1,200 mm above yard level, while trailer bed heights can range from roughly 900 to 1,600 mm across rigid, curtain-sider, refrigerated, double-deck and container chassis. If your trailers sit outside the leveller's range, the plate becomes too steep to use safely.
- Good fit: dedicated fleets or regular suppliers with similar trailers.
- Poor fit: sites receiving everything from low rigids to high double-deck trailers.
Where trailer heights vary, a pit leveller such as a swing-lip dock leveller gives a much longer, gentler ramp. We record your trailer heights at survey to confirm which suits.
How much does an edge-of-dock leveller cost?
An edge-of-dock leveller typically costs £1,800 to £4,400 per leveller, excluding VAT, supply and fit. That is considerably less than a pit leveller, because there is no pit to form or maintain and the unit itself is smaller.
The price depends on:
- Operation: mechanical units with a lever and spring assistance cost less than hydraulic push-button units.
- Width and capacity: wider plates and higher ratings for heavier forklifts.
- Fixing method: bolting to sound concrete, welding to an existing steel edge, or fitting a new edge angle first.
- Dock face condition: spalled or damaged concrete may need repair before fixing.
- Bumpers: often replaced or repositioned at the same time.
- Power: hydraulic units need a supply at the bay.
Concrete repairs or new edge steel are priced as separate items after survey, so you can see exactly what the leveller costs on its own. The written quote is the fixed price.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Traffic routes for vehicles and separation of pedestrians
- Drainage on recessed or sloping dock approaches
- Control positions, isolators and any existing interlocks
- Clear opening width and height for each door
- Condition of any existing leveller pit, kerb angles and pit drainage
- How drivers are prevented from pulling away too early
Options to discuss
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
Mechanical edge-of-dock leveller
Lever-operated with spring assistance and no power supply needed. Suits low-volume bays and sites with consistent trailers where simplicity matters most.
Planning, building control and safety law in England
Lift tables and dock lifts in Yarm may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about edge-of-dock levellers in Yarm
Is the site survey in Yarm free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Will you deal with building control and planning for a project in Yarm?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
How long does installation take at a site in Yarm?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Do edge-of-dock levellers need servicing?
Yes, they should be serviced and inspected like any leveller. Mechanical units need their springs, hinges and lip checked and lubricated, and hydraulic units also need hoses and the power pack inspected. Service visits are chargeable and agreed before anyone attends.
How long does an edge-of-dock leveller take to install?
Usually half a day to a day per bay, as there is no pit to form. Concrete or edge steel repairs add time, and hydraulic units also need connecting to power. We plan the work so the rest of the dock keeps operating while each bay is fitted.
Edge-of-dock levellers near Yarm
Sites close to Yarm get the same service, including those in Thornaby-on-Tees (3 miles), Stockton-on-Tees (5 miles) and Billingham (6 miles), with every job run the same way.
Other loading bay services in Yarm
Full guide to edge-of-dock levellers · Everything we do in Yarm
Use the quote tool to tell us about the doors, levellers or shelters at your Yarm site, and we will be in touch to arrange the next step.
