An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Is this right for your site in Melton Mowbray?
Replacing loose bridge plates at a dock in Melton Mowbray with a fixed edge-of-dock leveller removes the need to lift and position heavy plates by hand. On older buildings in Melton Mowbray where drains or services run close to the dock, avoiding a pit can make an edge-of-dock leveller the sensible route.
Wholesalers and trade suppliers in Melton Mowbray adding a second loading position can often do so economically with an edge-of-dock unit.
Any project involving edge-of-dock levellers at a working site in Melton Mowbray takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.
How much height difference can an edge-of-dock leveller handle?
An edge-of-dock leveller can only handle a small height difference, typically in the region of 75 to 150 mm above and below dock level depending on the model. That is enough where trailers are consistent, but not where bed heights vary widely.
Typical UK docks are around 1,200 mm above yard level, while trailer bed heights can range from roughly 900 to 1,600 mm across rigid, curtain-sider, refrigerated, double-deck and container chassis. If your trailers sit outside the leveller's range, the plate becomes too steep to use safely.
- Good fit: dedicated fleets or regular suppliers with similar trailers.
- Poor fit: sites receiving everything from low rigids to high double-deck trailers.
Where trailer heights vary, a pit leveller such as a swing-lip dock leveller gives a much longer, gentler ramp. We record your trailer heights at survey to confirm which suits.
Do edge-of-dock levellers need the same inspections as pit levellers?
Yes, an edge-of-dock leveller is work equipment just like a pit leveller, so it must be kept in a safe condition and inspected where deterioration could lead to danger. Its small size does not exempt it.
- Great Britain: PUWER 1998 applies, with HSE as the regulator.
- Northern Ireland: PUWER (Northern Ireland) 1999 applies, with HSENI as the regulator.
- Insurer inspections: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals, so ask your insurer to confirm edge-of-dock units are on the schedule.
- Standard: the dock leveller safety standard is BS EN 1398:2009, which is current and under review.
- Trapping points: HSE guidance notes that guards or skirting may be needed on dock levellers where something could be caught, so hinge areas and plate edges are checked.
Mechanical units rely on springs and hinges that wear, so an inspection should cover these as carefully as the hydraulics on a powered unit.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Power supply at each bay, including three-phase availability
- Yard gradient and the slope of the approach to the dock
- How often each door cycles during a typical shift
- Condition of any existing leveller pit, kerb angles and pit drainage
- Scope to convert ground-level doors into docks or add lift tables
- Forklift and pallet truck loads crossing the leveller platform
Options to discuss
Wider or heavy-duty plate
A wider plate or higher rating for larger forklifts, heavy loads or pallet trucks with a wide wheel track, specified after we look at your equipment.
Mechanical edge-of-dock leveller
Lever-operated with spring assistance and no power supply needed. Suits low-volume bays and sites with consistent trailers where simplicity matters most.
Regulations and approvals in England
Sites in Melton Mowbray fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about edge-of-dock levellers in Melton Mowbray
Can you work outside our normal operating hours in Melton Mowbray?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Is the site survey in Melton Mowbray free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Is VAT included in your guide prices for edge-of-dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Leicestershire as everywhere else: for edge-of-dock levellers, it is £1,800 to £4,400 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Do edge-of-dock levellers need servicing?
Yes, they should be serviced and inspected like any leveller. Mechanical units need their springs, hinges and lip checked and lubricated, and hydraulic units also need hoses and the power pack inspected. Service visits are chargeable and agreed before anyone attends.
How long does an edge-of-dock leveller take to install?
Usually half a day to a day per bay, as there is no pit to form. Concrete or edge steel repairs add time, and hydraulic units also need connecting to power. We plan the work so the rest of the dock keeps operating while each bay is fitted.
Edge-of-dock levellers near Melton Mowbray
Nearby places we cover, measured from Melton Mowbray, include Oakham (9 miles), Mountsorrel (12 miles) and Loughborough (13 miles). Ask if your own town is missing.
Other loading bay services in Melton Mowbray
Full guide to edge-of-dock levellers · Everything we do in Melton Mowbray
Start your enquiry for Melton Mowbray through the quote tool. A few photos and approximate sizes help us respond with something useful.