- Location
- Eastleigh, Hampshire
- Main postcode district
- SO50
- Nearby (straight line)
- Bishopstoke (1 mile), Hedge End (4 miles) and Southampton (5 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Where does this fit at a dock in Eastleigh?
Companies running their own vehicles in Eastleigh, where every trailer has a known bed height, are well placed to use edge-of-dock levellers instead of pit units. Replacing loose bridge plates at a dock in Eastleigh with a fixed edge-of-dock leveller removes the need to lift and position heavy plates by hand.
Exposed external docks in Eastleigh call for a galvanised or well-painted edge-of-dock leveller that stands up to the weather all year round.
Step one is a survey at your site in Eastleigh, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.
Where does an edge-of-dock leveller work best?
An edge-of-dock leveller works best where trailer heights are consistent, a pit is impractical, or the budget rules out a pit leveller. It is a practical choice for many smaller operations and for adding capacity at larger ones.
- Leased units: where the lease or landlord does not allow a pit to be cut into the slab.
- Dedicated fleets: sites loading their own vehicles of a known bed height.
- Extra bays: adding loading positions at a dock where most bays already have pit levellers.
- Difficult slabs: where drainage, services or the structure would make a pit costly.
- Low-volume docks: occasional deliveries that do not justify a pit leveller.
Our guide on how to choose a dock leveller compares edge-of-dock, swing-lip and telescopic units in more detail, including the trailer and equipment questions to answer before deciding.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Access for deliveries, cranes or lifting equipment during installation
- Wheel guide positions and yard markings for reversing vehicles
- Traffic routes for vehicles and separation of pedestrians
- Control positions, isolators and any existing interlocks
- Power supply at each bay, including three-phase availability
- Lighting inside trailers and at the dock face
Options to discuss
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
Wider or heavy-duty plate
A wider plate or higher rating for larger forklifts, heavy loads or pallet trucks with a wide wheel track, specified after we look at your equipment.
Which rules apply in England?
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Eastleigh. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about edge-of-dock levellers in Eastleigh
What details do you need from us to quote for edge-of-dock levellers?
To get started, send the site address in Eastleigh, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Eastleigh site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Is VAT included in your guide prices for edge-of-dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Hampshire as everywhere else: for edge-of-dock levellers, it is £1,800 to £4,400 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Do edge-of-dock levellers need servicing?
Yes, they should be serviced and inspected like any leveller. Mechanical units need their springs, hinges and lip checked and lubricated, and hydraulic units also need hoses and the power pack inspected. Service visits are chargeable and agreed before anyone attends.
Does the dock door still close with the leveller fitted?
Yes, in most layouts. Edge-of-dock levellers sit at the outer edge of the dock and store with the lip raised or folded, so the door closes behind them as normal. We check the clearance between the door, its bottom seal and the stored leveller at survey.
Edge-of-dock levellers near Eastleigh
Other towns within reach of Eastleigh on our coverage list include Bishopstoke (1 mile), Hedge End (4 miles) and Southampton (5 miles), all covered on the same terms.
Other loading bay services in Eastleigh
Full guide to edge-of-dock levellers · Everything we do in Eastleigh
Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Eastleigh.
