- Location
- Antrim, County Antrim
- Main postcode district
- BT41
- Nearby (straight line)
- Ballymena (10 miles), Newtownabbey (13 miles) and Belfast (14 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Where does this fit at a dock in Antrim?
Wholesalers and trade suppliers in Antrim adding a second loading position can often do so economically with an edge-of-dock unit. Exposed external docks in Antrim call for a galvanised or well-painted edge-of-dock leveller that stands up to the weather all year round.
Smaller distribution units in Antrim without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face.
Our part of the job in Antrim is to survey, quote and manage; the fitting itself is done by specialist installation engineers working under our management. The survey and the written quote are free. Once the fixed price is accepted, we agree dates that work around your deliveries and shifts, including out-of-hours working where needed. Every installation is tested before handover, and you receive the documentation for each item fitted.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
Do edge-of-dock levellers need the same inspections as pit levellers?
Yes, an edge-of-dock leveller is work equipment just like a pit leveller, so it must be kept in a safe condition and inspected where deterioration could lead to danger. Its small size does not exempt it.
- Great Britain: PUWER 1998 applies, with HSE as the regulator.
- Northern Ireland: PUWER (Northern Ireland) 1999 applies, with HSENI as the regulator.
- Insurer inspections: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals, so ask your insurer to confirm edge-of-dock units are on the schedule.
- Standard: the dock leveller safety standard is BS EN 1398:2009, which is current and under review.
- Trapping points: HSE guidance notes that guards or skirting may be needed on dock levellers where something could be caught, so hinge areas and plate edges are checked.
Mechanical units rely on springs and hinges that wear, so an inspection should cover these as carefully as the hydraulics on a powered unit.
The same published guide range applies across Northern Ireland; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Asbestos register and any other site hazard information
- Lighting inside trailers and at the dock face
- Headroom above the opening and which track type will suit it
- Wall and steel structure for door, shelter and bumper fixings
- Clear opening width and height for each door
- How drivers are prevented from pulling away too early
Options to discuss
Hydraulic edge-of-dock leveller
Push-button operation with a compact power pack, easier for frequent use and able to be interlocked with dock doors and traffic lights.
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
What do the rules in Northern Ireland mean for the work?
The equipment regulations have separate Northern Ireland versions: PUWER (Northern Ireland) 1999 for work equipment such as dock levellers and doors, and LOLER (Northern Ireland) 1999 for lifting equipment such as scissor lift tables. For sites in Antrim, your insurer or competent person will confirm inspection intervals, and we check what applies at survey.
Questions about edge-of-dock levellers in Antrim
Is VAT included in your guide prices for edge-of-dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in County Antrim as everywhere else: for edge-of-dock levellers, it is £1,800 to £4,400 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Is the site survey in Antrim free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
What details do you need from us to quote for edge-of-dock levellers?
To get started, send the site address in Antrim, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Can an edge-of-dock leveller be fitted to any dock?
Most docks can take one if the dock face or edge steel is sound enough to fix to. Damaged concrete or worn edge angles may need repair first. The more important question is whether your trailer heights fall within the leveller's small working range, which we check at survey.
Do edge-of-dock levellers need servicing?
Yes, they should be serviced and inspected like any leveller. Mechanical units need their springs, hinges and lip checked and lubricated, and hydraulic units also need hoses and the power pack inspected. Service visits are chargeable and agreed before anyone attends.
Edge-of-dock levellers near Antrim
Looking beyond Antrim? Our pages for Ballymena (10 miles), Newtownabbey (13 miles) and Belfast (14 miles) describe the same loading bay services and how to get in touch.
Other loading bay services in Antrim
Full guide to edge-of-dock levellers · Everything we do in Antrim
Phone us to discuss your loading bay in Antrim, or start with the online quote tool if you prefer to send details first.
