- Location
- Coalville, Leicestershire
- Main postcode district
- LE67
- Nearby (straight line)
- Loughborough (8 miles), Castle Donington (8 miles) and Swadlincote (9 miles)
- Survey and quote
- Free, with a fixed written quote
Dock traffic lights are red and green signals mounted outside and inside a loading bay to tell the driver and dock staff when it is safe to move or load. Interlocks are control links that stop equipment operating out of sequence, for example preventing the door opening until the trailer is restrained, or the leveller operating until the door is fully open.
Where does this fit at a dock in Coalville?
Older docks in Coalville with separate door and leveller controls can be brought into a proper sequence by adding interlocks that stop equipment working out of order. Food and chilled operations around Coalville with inflatable shelters often add interlocks so the shelter only inflates once a trailer is docked and restrained.
If a site in Coalville has had door panels damaged by levellers raised too early, a leveller-to-door interlock is a straightforward fix to consider.
How does an installation in Coalville work? First, a free, no-obligation survey to measure up and understand the operation. Next, a fixed written quote. Then a programme agreed with you, so the work fits around deliveries, with out-of-hours slots if needed. The installation itself is carried out by specialist engineers who answer to us, and it finishes with testing, a walk-through for your staff and a handover pack.
What happens on site when traffic lights and interlocks are fitted?
Fitting lights and interlocks is mainly electrical work, and each bay is out of use while its controls are connected and tested. Working bay by bay keeps the rest of the dock running.
- Fix the signals: the outside light is mounted on brackets at a height drivers can see, and the inside light beside the door.
- Run the cables: wiring is run in conduit or trunking between lights, sensors and control panels.
- Isolate and connect: the door and leveller supplies are isolated and locked off while the interlock wiring is connected, or a new bay panel is fitted.
- Test every sequence: each interlock is tested, including what happens if a step is attempted out of order.
- Brief staff: dock staff are shown the new sequence, and signs are fitted for drivers.
It helps if you can provide any electrical drawings for the dock, access to the distribution board, a person who can authorise isolations and an agreed order for releasing bays.
What does HSE guidance say about stopping drivers leaving too early?
HSE guidance (followed by HSENI in Northern Ireland) says there should be safeguards against drivers driving away from a loading bay too early, and it names traffic lights as one of the measures. Vehicle or trailer restraints, and the person in charge keeping keys or paperwork until it is safe, are the others listed in HSE's guide to workplace transport safety (HSG136) and its loading factsheet.
Traffic lights are a signal, not a physical barrier, so they work best as part of a clear procedure or alongside a restraint. Your risk assessment should decide the combination. In Northern Ireland the regulator is HSENI.
Interlocks also touch on door safety law. Under regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, or the Northern Ireland 1993 equivalent, powered doors need suitable and effective features to prevent them trapping anyone. Interlocks must never bypass those features, and door control work should respect BS EN 12453, the standard for safety in use of power-operated doors.
Read more in our guide to preventing drive-away and trailer creep.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Wheel guide positions and yard markings for reversing vehicles
- Access for deliveries, cranes or lifting equipment during installation
- Wall and steel structure for door, shelter and bumper fixings
- Condition of any existing leveller pit, kerb angles and pit drainage
- Escape routes and pedestrian doors close to the bay
- Age and condition of the equipment already in place
Options to discuss
Full bay interlock panel
A single control panel that runs the door, leveller, restraint and shelter in the correct sequence, with indicators showing which step is active or blocked.
Restraint interlock package
Door, lights and vehicle restraint tied together so the door only opens once the trailer is held and the restraint only releases when loading is finished.
Planning, building control and safety law in England
Sites in Coalville fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about dock traffic lights and interlocks in Coalville
Is VAT included in your guide prices for dock traffic lights and interlocks?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Leicestershire as everywhere else: for dock traffic lights and interlocks, it is £650 to £3,400 per bay, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Coalville site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Can you work alongside our main contractor on a new build in Coalville?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Are dock traffic lights enough on their own to stop drive-away?
Traffic lights on their own are a signal, not a physical barrier, so they depend on drivers obeying them. HSE lists traffic lights among the measures against early drive-away, and many sites combine them with key or paperwork control or with a vehicle restraint. The right combination should come from your workplace transport risk assessment.
Will interlocks slow down my loading operation?
Interlocks add a fixed sequence, but each step takes only moments and staff soon get used to it. In practice many sites find the sequence saves time overall, because there are fewer arguments about when to open the door and less damage from levellers being raised into part-open doors.
Dock traffic lights and interlocks near Coalville
Sites close to Coalville get the same service, including those in Loughborough (8 miles), Castle Donington (8 miles) and Swadlincote (9 miles), with every job run the same way.
Other loading bay services in Coalville
Full guide to dock traffic lights and interlocks · Everything we do in Coalville
Send a few photos of the dock and a short description of the problem, and we will come back to you about your Coalville site.
