Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock safety · Felling

Dock lights and wheel guides in Felling

Whatever the size of the operation, we can take on dock lights and wheel guides in Felling, with every job run by us and carried out by specialists we manage directly.

Guide £280–£950 per item ex VATFree site surveyNE10
Location
Felling, Tyne and Wear
Main postcode district
NE10
Nearby (straight line)
Gateshead (1 mile), Newcastle upon Tyne (2 miles) and Hebburn (3 miles)
Survey and quote
Free, with a fixed written quote
Dock lights and wheel guides, in short

Dock lights and wheel guides are two simple loading bay aids. A dock light is a lamp, usually LED, on a swing arm beside the dock door that shines into the trailer so forklift drivers can see the load. Wheel guides are steel rails fixed to the yard that steer the rear wheels so the trailer arrives straight and centred on the leveller.

Where does this fit at a dock in Felling?

Resurfacing works on a yard in Felling are an ideal moment to fit cast-in wheel guides, before the concrete is finished and bays come back into use. Tight yards in Felling where drivers reverse between parked trailers or around buildings make wheel guides especially useful for getting the trailer straight first time.

On older estates around Felling, dock lights may still use outdated lamps, and an LED swing-arm light is a simple upgrade that runs cooler.

How does an installation in Felling work? First, a free, no-obligation survey to measure up and understand the operation. Next, a fixed written quote. Then a programme agreed with you, so the work fits around deliveries, with out-of-hours slots if needed. The installation itself is carried out by specialist engineers who answer to us, and it finishes with testing, a walk-through for your staff and a handover pack.

What happens on site when dock lights or wheel guides are fitted?

Dock lights are fitted from inside the building and usually leave the bay usable for most of the work, while wheel guides close the bay to vehicles until the anchors have cured.

  1. Dock lights: the bracket is fixed beside the door, the arm and head fitted, and the supply connected and tested. The circuit is isolated briefly during connection.
  2. Wheel guides: the yard in front of the bay is coned off, guides are set out, drilled and anchored, and the resin is left to cure before trailers return.
  3. Concrete bases: where tarmac needs a concrete strip first, the bay stays closed until the concrete has gained enough strength.

We ask you to provide a clear bay, details of the nearest power supply, safe yard access and someone who can manage vehicle movements around the work area. Planning guide installation for a quieter period keeps disruption to a minimum.

Do health and safety rules cover dock lights and wheel guides?

Dock lights and wheel guides support your wider loading bay safety duties rather than replacing them. Once fitted, a dock light is work equipment under the Provision and Use of Work Equipment Regulations 1998 (PUWER), so it must be suitable, maintained in a safe condition and inspected where deterioration could lead to danger. In Northern Ireland the equivalent is PUWER (Northern Ireland) 1999.

HSE's guide to workplace transport safety (HSG136) is the main reference for managing vehicles in the yard, and its loading guidance says there should be safeguards against drivers driving away too early, such as traffic lights, restraints or key control. Wheel guides and dock lights do not meet that requirement on their own, but they help drivers park accurately and help dock staff see what they are doing.

Electrical work for dock lights is carried out by qualified electricians and tested before use. The regulator is HSE in Great Britain and HSENI in Northern Ireland.

Guide price, Felling
£280–£950 per item, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Scope to convert ground-level doors into docks or add lift tables
  • Temperature requirements for chilled, frozen or ambient goods
  • Age and condition of the equipment already in place
  • Traffic routes for vehicles and separation of pedestrians
  • Wheel guide positions and yard markings for reversing vehicles
  • Gaps around trailers where heated or chilled air escapes

Options to discuss

Low-voltage dock light

A swing-arm light fed through a transformer mounted nearby, for sites that prefer a reduced voltage at the lamp head. Same reach and folding action as a mains light.

Cast-in wheel guides

Guides set into new concrete with embedded anchors during yard works, giving a very strong fixing for new-build docks, resurfaced yards and loading bay conversions.

What do the rules in England mean for the work?

Workplace safety in England is regulated by HSE. For a loading bay in Felling, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.

Questions about dock lights and wheel guides in Felling

Will you deal with building control and planning for a project in Felling?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Can you work outside our normal operating hours in Felling?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Which building and safety rules apply to a site in Felling?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Felling, we check what applies at survey and design to it.

Where should a dock light be mounted?

A dock light is mounted inside the building beside the door opening, high enough to swing over the leveller and into the trailer. It must fold back flat against the wall, clear of the door tracks and the forklift route, so it is not struck when the bay is not in use.

Can dock lights be fitted without stopping loading?

Usually yes. Dock lights are fitted from inside the building beside the door, and the bay can often keep working except for a short period while the supply is isolated and connected. We agree timings with you so the work fits around trailer arrivals.

Dock lights and wheel guides near Felling

Close neighbours of Felling with their own pages here: Gateshead (1 mile), Newcastle upon Tyne (2 miles) and Hebburn (3 miles). Choose one to see coverage details for that town.

Other loading bay services in Felling

Full guide to dock lights and wheel guides · Everything we do in Felling

Tell us what is happening at your Felling dock, what equipment is there and when it is used, and we will suggest the right next step.

Call freeGet a quote