- Location
- Feltham, Greater London
- Main postcode district
- TW13
- Nearby (straight line)
- Ashford (2 miles), Hounslow (3 miles) and Sunbury-on-Thames (3 miles)
- Survey and quote
- Free, with a fixed written quote
A complete loading bay installation is the supply and fitting of every item a dock needs as one coordinated package: typically an insulated door, a dock leveller, a shelter or seal, bumpers, wheel guides, a dock light and traffic lights or interlocks. One party manages the design, sequence and commissioning, so the parts fit together and work as a single system.
Why do sites in Feltham choose this?
Every complete bay enquiry in Feltham starts with a site survey and a written quote that sets out exactly what is included and what is priced separately. Cold chain operators near Feltham benefit from specifying the insulated door, shelter and leveller as one package so the thermal details match at every bay.
Developers building new distribution sheds in Feltham can hand the whole dock package to one specialist, reducing the risk of gaps between the door, leveller and shelter trades.
For complete loading bay installations in Feltham, we begin with a free site survey and a fixed written quote, so you know the scope and cost before committing. We take responsibility for managing the job, and specialist installation engineers carry it out under our supervision. Bays are taken out of use in a planned sequence so the rest of the dock keeps working, and evening or weekend work can be arranged. Each item is tested at handover and the documentation is left with you.
A note on the freight picture around Feltham and beyond: Heathrow's logistics and air-cargo cluster is close by. Whatever traffic your own site handles, specify the dock to suit it.
What regulations and standards apply to a new loading bay?
A new loading bay has to meet door safety law, work equipment law and, for the door, energy rules. The main references are:
- Doors: regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992 (Northern Ireland: the 1993 equivalent). Upward-opening doors need a device to stop them falling back, and powered doors need features to prevent trapping. Doors are made to BS EN 13241, with powered door safety covered by BS EN 12453.
- Levellers: BS EN 1398:2009, the dock leveller safety standard.
- All dock equipment: PUWER 1998, or PUWER (Northern Ireland) 1999, requiring suitable, maintained and inspected work equipment.
- Drive-away: HSE guidance (HSG136) says there should be safeguards against early drive-away, such as traffic lights, restraints or key control.
- Energy: in England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access doors. Other nations have their own rules, and we confirm the figure for your project.
Equipment in Great Britain may carry UKCA or CE marking; in Northern Ireland, CE or CE with UKNI.
How is a complete bay coordinated with civils and electrics?
A complete bay is coordinated by issuing pit, dock face and electrical details early, so the groundworker, main contractor and electrician build exactly what the equipment needs. Most problems on new docks come from mismatches between trades, not from the equipment itself.
- Drawings: we provide pit dimensions, steel edge details, drainage points and dock face levels for each bay.
- Civils: the groundworker forms the pits, approach and dock face to those drawings, or the leveller is set in place for concrete to be poured around it.
- Building envelope: the main contractor forms the openings and cladding to suit the door and shelter sizes.
- Electrics: the electrician brings a supply to the agreed control panel position at each bay.
- Equipment: leveller, door, shelter and safety items are fitted in sequence, then commissioned together.
The quote states clearly which items are ours and which belong to other trades. See our guide to loading bay design for dock heights, widths and approaches.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Working hours, shift patterns and windows for out-of-hours work
- Gaps around trailers where heated or chilled air escapes
- Scope to convert ground-level doors into docks or add lift tables
- Control positions, isolators and any existing interlocks
- Drainage on recessed or sloping dock approaches
- Yard gradient and the slope of the approach to the dock
Options to discuss
High-throughput bay
A faster door, telescopic-lip leveller and vehicle restraint with interlocked traffic lights, for docks handling many trailers a day and where drive-away risk is high.
Standard ambient bay
Insulated sectional door, hydraulic swing-lip leveller, retractable shelter, bumpers, wheel guides and a dock light. Suits general distribution and manufacturing docks handling mixed trailer types.
Which rules apply in England?
Workplace safety in England is regulated by HSE. For a loading bay in Feltham, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about complete loading bay installations in Feltham
Is VAT included in your guide prices for complete loading bay installations?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Greater London as everywhere else: for complete loading bay installations, it is £13,500 to £26,000 per bay, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Do you cover Feltham for complete loading bay installations?
Yes. We take on complete loading bay installations for businesses in Feltham and across Greater London. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
Can you work outside our normal operating hours in Feltham?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Do all bays on a site need the same equipment?
No. Many sites keep most bays on a standard specification and fit one or two bays differently, for example with a telescopic lip for end-loading or a lift table for vans. Keeping a common door, control and shelter type where possible makes training and servicing simpler.
Who forms the leveller pit?
The leveller pit is usually formed by the groundworker or main contractor to our drawings. Where there is no groundworker on site, we can arrange the pit works as part of the project, priced separately after survey. Either way, the pit details come from the leveller chosen for the bay.
Complete loading bay installation near Feltham
We also cover towns near Feltham, including Ashford (2 miles), Hounslow (3 miles) and Sunbury-on-Thames (3 miles). Each has its own page with the same services and process.
Other loading bay services in Feltham
Full guide to complete loading bay installations · Everything we do in Feltham
Tell us what is happening at your Feltham dock, what equipment is there and when it is used, and we will suggest the right next step.
